Part Number: DD101 LONG LEAD | Manufacturer: Crl Components Inc | NSN: 5910-00-678-8157 (5910006788157) | |
Alternate P/N : DD101LONGLEAD | Item Name : capacitor fixed cer | CAGE Code: 71590 | FSC : 5910 Capacitors |
We currently have Part Number DD101 LONG LEAD with NSN 5910006788157 in stock. This component is manufactured by Crl Components Inc under CAGE Code 71590 and described as Capacitor Fixed Cer..
To get a quote , all you need to do is fill out the form for DD101 LONG LEAD part provided below. Make sure that you fill in all the necessary details, this will help us provide the quote that meets your needs. Once you submit the form, one of our experienced representatives will get back to you with a quote in 15 minutes or less.
With over 100 million parts sold, we are among the reputed independent distributors within the United States. Sourcingstreamlined.com has over 26 different distinct federal supply code categories, with more than 10 million national stock numbers from 5,000 leading manufacturers.
A national stock number, also known as an NSN, part bears an official label indicating its procurement, storage, and stocking within the Federal supply system. NSN parts are an essential part of the military and defense logistics supply chain and can have multiple part numbers under it depending on whether it has multiple manufacturers for the same part. Part number DD101 LONG LEAD belongs to the Federal Supply Group 5910 Capacitors.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: Capacitor Fixed Cer | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Dd101 Long Lead | 1 | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B- |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
All Orders are Fulfilled in the USA.
All shipments must comply with USA export laws.
No exceptions.
The only independent distributor
with a NO CHINA SOURCING Pledge
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”.
We Hope You Remember Us the Next Time You are Looking for NSN Parts.
Request for Quote